Substation Automation — HT/LT Panel Monitoring & Control

Centralised PLC and SCADA for HT/LT substations across a defence facility — 1,350+ I/O points, real-time breaker control, energy monitoring and alarm management.

Client:

Public Sector Defence Organisation, India

Focus:

PLC + SCADA for Power Infrastructure

Service:

Control & Automation

Car Construction

Project details

Overview

Elezon delivered a complete PLC and SCADA solution for the electrical substations of a large public sector defence facility — integrating all HT and LT substations into a single centralised supervision and control system for the first time.

The scope covered 1,350+ I/O points across multiple substations, real-time breaker supervisory control, energy monitoring with RS-485 metering and a fully redundant communication architecture.

Client challenges

Before optimization, the facility struggled with several energy-related issues:

  • LT / HT panels spread across a large campus with no centralised communication network

  • Manual breaker operation creating safety risk and slow fault response

  • No real-time energy visibility — no data for efficiency or compliance reporting

  • Integration required with new and existing switchgear from multiple manufacturers

  • Defence facility uptime requirements — commissioning with zero production disruption

Objectives

The key objectives of the project were to:

  • Centralise monitoring and control of all HT/LT substations under a single SCADA

  • Enable remote breaker supervisory control — eliminating manual local operation

  • Implement real-time energy monitoring across all incomer and feeder points

  • Establish fibre optic communication network across entire facility

  • Complete commissioning with zero unplanned outages to facility operations

Solution approach

Elezon designed and implemented a centralised PLC and SCADA system covering all electrical substations. A fibre optic network connected all substations to a central control room. PLC-based breaker supervisory control enabled remote open and close from the control room. SCADA displayed real-time single line diagrams, breaker status and energy dashboards. Alarm management with notification and historian for long-term data storage completed the solution.

Core elements of the solution included:

  • PLC-based substation automation panel

  • 1,350+ I/O points — breaker status, energy metering, alarms

  • Centralised SCADA with single line diagram displays

  • Fibre optic communication network across entire facility

  • Remote breaker supervisory control — open and close from control room

  • RS-485 energy metering at all incomer and feeder points

  • Alarm management with SMS and email notification

  • Historian for long-term energy and event data storage

  • Full redundancy at communication and control layers


Implementation process

The project was delivered through a structured and low-disruption process:

  • Design
    Campus audit. Substation inventory compiled. Communication network routing designed. I/O schedule across 1,350+ points developed.

  • Manufacturing
    PLC automation panels manufactured at Elezon's Bengaluru facility. FAT conducted with full I/O simulation.

  • Deployment & Integration
    Fibre optic network installed. PLC panels commissioned at each substation. SCADA integration completed with live breaker control testing.

  • Training & Reporting Setup
    Energy monitoring validated. Alarm management configured. Electrical and operations teams trained on SCADA, breaker control and alarm response.

Conclusion

Elezon delivered complete centralised visibility and control across a defence facility's HT/LT substation — 1,350+ I/O points, commissioned without a single unplanned outage. Remote breaker control eliminated manual local operation, improving both safety and response time. Energy monitoring data immediately enabled identification of power factor issues with measurable cost reduction.

Review

"Complete HT/LT substation visibility — 1,350+ I/O points, delivered on schedule, zero issues."

"Elezon integrated all our LT & HT electrical infrastructrure into a single centralised PLC and SCADA system — for the first time in our facility's history. Real-time breaker control, energy monitoring and alarm management across the entire campus. Commissioned without a single unplanned outage and fault-free since handover."

60%

Faster fault response time

"Complete HT/LT substation visibility — 1,350+ I/O points, delivered on schedule, zero issues."

"Elezon integrated all our LT & HT electrical infrastructrure into a single centralised PLC and SCADA system — for the first time in our facility's history. Real-time breaker control, energy monitoring and alarm management across the entire campus. Commissioned without a single unplanned outage and fault-free since handover."

60%

Faster fault response time

"Complete HT/LT substation visibility — 1,350+ I/O points, delivered on schedule, zero issues."

"Elezon integrated all our LT & HT electrical infrastructrure into a single centralised PLC and SCADA system — for the first time in our facility's history. Real-time breaker control, energy monitoring and alarm management across the entire campus. Commissioned without a single unplanned outage and fault-free since handover."

60%

Faster fault response time

Contact us

Let’s build your next solution today.

Whether you’re optimizing existing systems or designing something new, our team delivers reliable future-ready solutions.

Man

Contact us

Let’s build your next solution today.

Whether you’re optimizing existing systems or designing something new, our team delivers reliable future-ready solutions.

Man

Contact us

Let’s build your next solution today.

Whether you’re optimizing existing systems or designing something new, our team delivers reliable future-ready solutions.

Man